Lp smartside 38 series lap siding may be attached directly to framing members that are spaced up to a maximum of 16 in.
Lp smartside vertical siding installation instructions.
This video shows you how to install lp smartside trim siding products with easy step by step instructions.
Check your local building code before starting to install the sid.
Download our helpful installation instructions and watch our informative how to videos.
Prefinished lap joint siding.
Step 1 hold the metal.
Backer rod may be required by the sealant manufacturer.
Nailing instructions lp smartside 38 series lap siding may be attached directly to framing members spaced a maximum of 16 inches 406 mm o c.
Board and batten with vertical panel siding.
Lp smartside lap siding installation using h molding.
Trim install kick out flashing to direct the water into the gutter install step flashing with minimum 4 in.
When using smartside siding with other siding products like stucco brick or cultured stone veneers it is important to use a capillary break so moisture absorbed into those veneers cannot be transferred into siding.
How to install lp smartside trim siding.
Roof edge up to the eave edge of the roof line.
Nailing instructions lp smartside 76 series lap siding may be attached directly to framing members spaced up to a maximum of 24 in.
Keep the top edge of the metal on the plane of the sheathing slide the metal roof edge up or down the roof until a 5 8 measurement is achieved perpendicularly out from the fascia to the inside of the bend in the metal roof edge.
View all product literature.
Lp smartside 76 series lap siding may be attached directly to framing members spaced a maximum of 24 inches 610 mm o c.
Check your local building codes before starting to install siding.
Lp smartside trim and fascia are available in a variety of dimensions.
Tn 028 vertical siding.
Separate smartside siding from veneers with minimum 3 8 inch 10 mm space for horizontal or vertical joints use sealant.
We ll also review the proper tools needed and.